Two interesting ideas here:

  • "trading time"
  • price impact of a trade proportional to exp( √size )

Code follows:

require(quantmod)
getSymbols("MER")                           #Merrill Lynch

#Gatheral's model
HiLo <- function(symbol) log( Hi(symbol) / Lo(symbol) ) **2
UpDay <- function(symbol) Cl(symbol) > Op(symbol)

#munging
mer <- merge( MER, UpDay(MER), HiLo(MER) )
mer <- data.frame(mer)
names(mer)[7] = "UpDay"
names(mer)[8] = "HiLo" mer <- subset(mer, Vo(mer) > 0) #data cleaning #plot layers require(ggplot2) base <- ggplot(data=mer, aes(x=log(MER.Volume), y=HiLo, col=as.factor(UpDay))) points <- geom_point(alpha=.5) #no more I(.5) ! line <- geom_smooth(method='lm', col='red', fill='red') labels <- labs(y="Volatility", x="Volume", colour="Up day?", title="Jim Gatheral's model") #more munging winners <- subset(mer, UpDay>0) losers <- subset(mer, UpDay<0) col.winner <- '#0077cc' #yellow col.loser <- '#ddaa00' #blue #more plot layers rug.winners <- geom_rug(alpha=.5, col=col.winner, data=winners, sides='tr') rug.losers <- geom_rug(alpha=.5, col=col.loser, data=losers, sides='bl') colour <- scale_colour_manual(values= c(col.loser, '#333333', col.winner) ) #some days $MER ended up where it started: grey those ###PAYOFF### #simpler plot with margins and fit base + points + line + labels + colour + rug.winners + rug.losers #what was hard about that was combining new columns
#(model columns: Jim Gatheral's transforms) in xts,
#and combining xts with ggplot2 ########### #now let's close with an even better, but larger, ggplot: replacing the rugs with smoothed histograms like http://stackoverflow.com/a/8545849/563329 require(gridExtra) loser.depth.hist <- ggplot() + geom_density(data=losers, fill=col.loser, col=FALSE, alpha=.5, aes(x=log(Vo(mer)))) + theme_bw() %+replace% theme(axis.text.y = element_blank(), axis.ticks.y = element_blank()) #the differences among these long lines are just substitutions: s/volume/volatility/ and s/loser/winner/ winner.depth.hist <- ggplot() + geom_density(data=winners, fill=col.winner, col=FALSE, alpha=.5, aes(x=log(Vo(mer)))) + theme_bw() %+replace% theme(axis.text.y = element_blank(), axis.ticks.y = element_blank() ) loser.range.hist <- ggplot() + geom_density(data=losers, fill=col.loser, col=FALSE, alpha=.5, aes(x=HiLo(mer))) + theme_bw() %+replace% theme( axis.text.y = element_blank(), axis.ticks.y = element_blank() ) winner.range.hist <- ggplot() + geom_density(data=winners, fill=col.winner, col=FALSE, alpha=.5, aes(x=HiLo(mer))) + theme_bw() %+replace% theme( axis.text.y = element_blank(), axis.ticks.y = element_blank() ) #depth and range are better abbrevs than vol and vol #now to align these on the edges of the graph while still keeping things straight as to what goes on top, left, right: some gratuitous titling right.hist <- winner.range.hist + coord_flip() left.hist <- loser.range.hist + coord_flip() + scale_x_reverse() top.hist <- winner.depth.hist bottom.hist <- loser.depth.hist + scale_y_reverse() #http://stackoverflow.com/a/8545849/563329 empty <- ggplot() + geom_point(aes(1,1), colour='white') + theme(axis.ticks=element_blank(), axis.text.x=element_blank(), axis.text.y=element_blank(), axis.title.x=element_blank(), axis.title.y=element_blank() ) ###SECOND PAYOFF### grid.arrange( empty, top.hist, empty,
left.hist, base + points + line + labels + colour + rug.winners + rug.losers, right.hist,
empty, bottom.hist, empty, widths=c(1,10,1), heights=c(1,10,1) ) # phew!

(This doesn’t run as is. I think you can fix that by combining the ggplot pieces differently. I just gave the pieces semantic names combing through my history.

(Source: finmath.stanford.edu)







14 notes

  1. scooternyne reblogged this from isomorphismes
  2. whatchacallit reblogged this from isomorphismes
  3. nazard reblogged this from isomorphismes
  4. isomorphismes posted this